
Machinery & equipment
Industrial machinery and equipment sourcing
Production machinery, processing and packaging lines, agricultural equipment and spare parts sourced to technical specification and compliance requirements.
Machinery & Equipment
Availability, specifications and pricing are confirmed individually for each enquiry. Listing a product category here does not mean that it is held in stock.
Machinery purchases are long-term decisions. Output, utilities, footprint, automation level, spare parts availability, service support and compliance with machinery safety rules matter as much as the purchase price.
We work from your technical specification or user requirement, identify manufacturers whose equipment matches it, and help compare offers on a like-for-like basis — including factory acceptance testing, installation, training and spare parts where these are required.
Product range
Machinery & Equipment
- 01
Industrial machinery
General industrial machines for processing, handling and fabrication.
- 02
Manufacturing equipment
Production equipment and lines for metalworking, plastics and assembly.
- 03
Food-processing machinery
Equipment for preparation, cooking, cooling, cutting and processing of food.
- 04
Packaging machinery
Filling, sealing, wrapping, labelling and end-of-line packaging equipment.
- 05
Agricultural machinery
Tractors, implements, harvesting and post-harvest equipment.
- 06
Industrial equipment
Compressors, generators, pumps, material handling and workshop equipment.
- 07
Spare parts
OEM and compatible spare parts identified by part number or drawing.
Points to specify
| Utilities | UK and EU industrial supply typically 400 V, three-phase, 50 Hz; compressed air and water as required |
|---|---|
| Compliance | CE marking (EU), UKCA or CE as accepted (GB); Machinery Directive 2006/42/EC, Regulation (EU) 2023/1230 from 20 January 2027 |
| Acceptance | Factory acceptance test (FAT) and site acceptance test (SAT) with measurable criteria |
| Documentation | Declaration of conformity, manuals in the destination language, electrical drawings, spare parts list |
| Support | Installation, commissioning, training, warranty and spare-parts lead times |
Typical applications
- Food processing and bakery plants
- Packaging and end-of-line automation
- Metal fabrication and machining
- Agriculture and post-harvest handling
- Warehousing and material handling
- Construction and building materials
What to include in your enquiry
- Machine type, required output or capacity and the product being processed
- Utilities: voltage, phase, frequency, compressed air, water
- New or used, preferred manufacturers and automation level
- Compliance requirements for the destination (for example CE or UKCA marking)
- Installation, commissioning, training and spare-parts requirements
- Delivery destination, timeline and preferred Incoterms
| Typical order basis | Per machine or per line, with options, spares and services itemised. |
|---|---|
| Compliance | Machinery placed on the UK or EU market generally requires conformity assessment and marking. EU machinery rules are moving to Regulation (EU) 2023/1230, applying from January 2027. |
| Acceptance | Factory acceptance tests and pre-shipment inspection can be specified in the purchase terms. |
| Lead times | Built-to-order machinery lead times vary by manufacturer and are confirmed in each quotation. |
Related categories
Related services
Frequently asked questions
Can you source used machinery?
Used machinery can be considered where the buyer requests it. Condition, inspection and compliance responsibilities need careful agreement and are set out in the quotation.
Do you provide installation?
Installation and commissioning are typically provided by the manufacturer or its agents. We coordinate the scope and include it in the quotation where requested.
Can you find spare parts for existing machines?
Send the machine make, model, serial number and part numbers or drawings. We will look for OEM or compatible options and confirm what is available.
What is a factory acceptance test?
A FAT is a test at the manufacturer's site, before shipment, to show that the machine meets the agreed specification — ideally running your own product samples. It is usually linked to a payment milestone.
Do machines need manuals in my language?
In the EU, instructions must generally be supplied in the official language(s) of the member state where the machinery is placed on the market. Include this requirement in the purchase terms.
How to Compare Industrial Machinery Quotes
Machinery offers rarely quote the same thing. Here is how to normalise them before deciding.
Read article 2026-10-19Supplier Evaluation Checklist for B2B Buyers
What to check before placing a first order with a new international supplier — and how to tell evidence from claims.
Read article 2026-10-19Incoterms 2020 Explained for B2B Buyers: FOB, CIF, DAP, DDP
Where risk transfers, who pays for what, and which rule suits containerised cargo.
Read article 2026-10-19Get in touch
Enquire about this category
Call or email us to discuss a product requirement, a supplier partnership or anything else.
To help us respond quickly, please include:
- The product, grade, standard or model you need
- Quantity and unit (for example tonnes, units, containers)
- Delivery destination and timeline
- Any certifications or documents you require